Friday, September 22, 2023

Screen Shot 2021-08-29 at 10.08.52 AM

The storm water drain pipe shown here, carrying water from areas south of the base and located on the beach just south of the Locust Grove subdivision, contained 5 separate PFAS totaling 9.5 ppt., including PFOS at a concentration of 4.4 ppt.

The storm water drain pipe shown here, carrying water from areas south of the base and located on the beach just south of the Locust Grove subdivision, contained 5 separate PFAS totaling 9.5 ppt., including PFOS at a concentration of 4.4 ppt.